Skip to content
All work
94Apparel Manufacturing

StitchWorks Apparel

A production planning system that turned apparel manufacturing from chaos into a system.

40%
Lead time reduction
96%
On-time delivery
2.5x
Production scaled
Growth trajectory — Production scaled
Before: 1.0xAfter: 2.5x
01The Challenge

An apparel manufacturer with manual production planning, no real-time WIP tracking, and quality issues caught too late. Lead times were unpredictable, and the factory couldn't scale without adding production managers.

02The Solution

Built a manufacturing platform with AI-powered production planning, real-time WIP tracking, AI quality inspection, and a supplier portal that scaled production 2.5x.

03The Outcome

Lead times dropped 40%, on-time delivery hit 96%, and production scaled 2.5x — all with the same management team.

04What we built

We built a manufacturing platform with AI-powered production planning that optimized cutting, sewing, and finishing schedules based on order priority, capacity, and material availability. Real-time WIP tracking showed every garment's status on the floor. AI quality inspection caught defects at each stage, reducing rework. A supplier portal managed fabric and trim ordering with automated reorder points, and a client portal gave brands real-time visibility into their orders.

AI-powered production planning & scheduling
Real-time WIP tracking
AI quality inspection at each stage
Supplier portal & automated reordering
Client order visibility portal
05Build sequence
01
Week 1-3: Factory & production audit
02
Week 4-7: Platform & planning build
03
Week 8-11: Tracking & quality
04
Week 12-15: Portals & rollout
Total timeline15 weeks

Want infrastructure like this for your business? Start with a free Growth Snapshot to see where you stand and what to build first.

Ready to build infrastructure that compounds?

We map your positioning, systems, and growth constraints — then architect the infrastructure that compounds. Clarity on what to build first, and why it matters.

Clarity on what to build first.

Scroll